25°CSiberut Island
NewsInvestor Login
Digital Infrastructure - Data Centres

Powered byThe Earth Itself

One hundred per cent 24/7 geothermal and solar energy across a 220 MW dual-hub architecture. SEZ data sovereignty, US$0.07-$0.09/kWh clean power, and a 15%-25% Sovereign Green AI Compute tariff premium positioned between Singapore, Jakarta, and Australia.

220 MW
Dual-hub capacity (200 MW Padang + 20 MW Siberut)
US$0.07-0.09
Per kWh 24/7 geothermal baseload tariff
+15-25%
Sovereign Green AI Compute tariff premium
Zero Scope 2
Audited on-chain via ACTA carbon retirement
Power Advantage

Geothermal Infrastructure That No Other Island Has.

Operated by SPV-014 (MTC-DataCentre), Mentawai One's 220 MW dual-hub data centre platform pairs a 200 MW hyperscale AI campus in the Padang mainland industrial zone with a 20 MW ultra-low-latency sovereign vault on Siberut Island. Delivered via the HVDC subsea interconnector (SPV-032) and island solar microgrids (SPV-022), clean baseload power at US$0.07-$0.09/kWh reduces utility OPEX by 65%-75% compared to diesel or coal-heavy regional grids while waste-heat recovery into absorption chillers avoids 32,000 tCO2e/yr.

Data Sovereignty

An Independent Jurisdiction With Its Own Data Framework.

The Mentawai Bay SEZ data sovereignty framework establishes clear rules on data residency, access, and jurisdiction - governed under English common law within the SEZ charter. For hyperscale AI, financial, and sovereign cloud operators needing data localisation outside Singapore's power-constrained footprint and separate from conventional national grids, Mentawai One offers an independently governed, 100% renewable alternative.

The Torqua & ACTA Layer

Zero Scope 2 Compute Built Into Every Rack.

Every megawatt-hour consumed by SPV-014 is matched by geothermal and solar carbon abatement retired directly on the ACTA registry (part of the ecosystem's 747,611 tCO2e/yr internal Scope 2 retirement pool), completely eliminating carbon-tax exposure and allowing enterprise clients to claim verifiable Zero Scope 2 AI training and inference. Meanwhile, the 1.75% Torqua sustainability reserve and 1-5% B-Corp levy route data centre cashflows directly into Siberut rainforest and reef protection.

Locate at Mentawai Bay

220 MW dual-hub data centre co-location, sovereign AI compute, and managed cloud infrastructure opportunities within the SEZ.